Text Version of the BAP Implementation Timeline

The image is an infographic detailing the applicability of the Buy America Preference (BAP) on three types of grants and programs relating to HUD funding over a timeline from 2022 to 2025. The infographic is organized into four sections, each representing a different grant or program. Each section contains a horizontal timeline with color-coded bars and text labels to indicate specific materials and funding applicability dates.

  • CDBG Formula Grants:
    • Timeline starts with iron and steel, applicable from November 15, 2022.
    • Specifically listed construction materials begin in FY24, with a purple bar ending in 2024.
    • Manufactured products and non-listed construction materials extend into 2025 with green and gold bars respectively.
  • Recovery Housing Program (RHP) Grants:
    • Iron and steel are indicated from August 23, 2023.
    • FY24 appropriations last through 2024.
    • Non-listed construction materials and manufactured products continue into 2025, depicted through green and gold bars.
  • All CPD Programs, except HOME and Housing Trust Fund:
    • Iron and steel apply from February 22, 2024.
    • Non-listed construction materials and manufactured products are shown with green and gold bars, applicable into 2025.
  • All CPD Programs, including HOME and HTF:
    • Timeline starts with a section for iron and steel applicable from August 23, 2024.
    • Similarly, non-listed construction materials, manufactured products, and specifically listed construction materials continue into 2025, marked with green, gold, and purple bars respectively.

Each section has a golden arrow indicating continuation into the future beyond the listed years.