How many copies of plans are required for permit review?
Three (3) copies of all construction documents and supporting information are to be submitted with the application for all building permits. Separately bound project manuals and specifications need only be provided in duplicate.

EXCEPTION: Only two (2) copies are needed of drawings for fire alarm and fire suppression systems and of drawings for plumbing, electrical and HVAC work that are part of a project for which a building permit application has previously been filed.

Show All Answers

1. What is a building permit?
2. When do I need a building permit?
3. How can I find out the permit fees for my project?
4. Why do I need a building permit?
5. If my building or house has had a fire or has been damaged by a vehicle or a storm, what do I need to do?
6. When don’t I need a building permit?
7. When do I not need a plumbing, electrical or mechanical permit?
8. How do I apply for a permit?
9. What building codes does the City of Dayton enforce?
10. Where is the Division of Building Inspection located?
11. When do I need to submit plans?
12. Can I apply for a permit online?
13. How long does it take to get a permit?
14. How many copies of plans are required for permit review?
15. How many copies of revised plans are needed?
16. How do I arrange for an inspection?
17. What should I know about inspections during construction?
18. How do I know if a property is within the Dayton city limits?
19. How do I know if a building is in a historic district with special requirements?
20. What is required to get electric service connected?
21. What are the hours of operation for the Building Inspection Permit Counter?
22. What is required to get natural gas service connected?
23. What services are provided at the One Stop Center (371 W. 2nd St.)?